Products and Services :
Specialise in :
- M130 Electro-Garvanised Metal Door Frames
- M130 Electro-Garvanised Metal Window Frames
- Concrete Pile End Plates (5 inch/6 inch and 8 inch)
- Concrete Beam Links for Building Works Usage
- Cylindrical Lock
Jun Hardware Enterprise
Installation-Step 1
Mark out the area where the brickwork and the door is going to be.
标出砌砖及装置门的位置
Installation-Step 2
Use two lengths of timber to prop up the door frame to standing position.
使用两根木材来坚立门框
Installation-Step 3
Use a spirit level to plumb the frame. When it is plumb, secure the timber stays with a couple of bricks (as shown above).
使用水平测量仪设定框架水平。当它是垂直时,获取木材和利用一些砖块来固定支撑杆(如上所示)
Installation-Step 4
You can now proceed to lay the bricks into the rebate at the back of the frame.
现在可以进行砌砖工作,继续在门框后的槽口部位铺砌砖块
Installation- Step 5
Place mortar into the gap between the brick and the frame to ensure that the frame when filled with cement will be extremely rigid and strong.
填水泥进砖和门框接口保证门框用水泥填补,添上水泥使门框更加结实
Installation-Step 6
Each metal door frame is supplied with a number of wire ties. Use a tie every fourth or fifth course of bricks.
每个门框供应以特定数量的钢线砖栓,使用钢线砖栓在每第四个或第五个砖